CommScope

CommScope is an American network-infrastructure company that designs and manufactures connectivity and communications products for wired and wireless networks.

Registered address
73 Science Park Drive, #01-14 Cintech 1 Building, Singapore 118254
Team size
1000+
Request a quoteContactVisit website

Overview of CommScope

Specializations
Network InfrastructureTelecom

CommScope is an American network-infrastructure company that designs and manufactures connectivity and communications products for wired and wireless networks. Its portfolio spans fiber and copper cabling, structured-cabling systems, antennas, base-station and broadband equipment, and data-center connectivity solutions. CommScope serves telecom carriers, cable operators, enterprises, and data-center operators, providing the physical layer that carries voice, video, and data. Built partly through acquisitions including ARRIS and the broadband network solutions business, the company supports 5G, broadband, and high-density data-center deployments across many global markets.

  • Recorded Singapore presence: Singapore-registered entity (UEN), Physical Singapore office
  • Address: 73 Science Park Drive, #01-14 Cintech 1 Building, Singapore 118254
  • Phone: +1-828-324-2200
  • Website: https://www.commscope.com

Profile updated 7 Jul 2026 Report incorrect data

Buyer Decision Checklist

Connectivity decisions in Singapore hinge on licensing, route diversity, and contractual SLAs far more than headline speeds. Use this checklist to separate a resilient carrier partner from a thin reseller before you commit to a 24-36 month term.

How to evaluate a telecommunications / connectivity provider in Singapore

  • Confirm the IMDA licence class behind the service: an FBO owns fibre, spectrum, and exchanges, while an SBO resells that capacity — for low-latency, mission-critical links, ask which underlying carrier actually delivers the circuit.
  • Pin down the SLA in writing — committed uptime, latency, jitter, packet loss, and a named MTTR with a credit schedule — and reject any "best effort" language for business-grade lines.
  • Ask for route and carrier diversity: verify that primary and backup paths use physically separate ducts and ideally separate carriers, not two lanes in the same conduit.
  • Lock down installation lead times and require a site survey upfront — fibre installs can run 4-12 weeks — and negotiate 30-day dual-running of old and new services to avoid a hard-cutover outage.
  • Read the termination and exit terms before signing: early-termination charges, notice periods, IMDA-mandated number portability for any fixed-line or mobile numbers, and who owns the on-site equipment at the end.
  • Map data sovereignty for voice: ask where call recordings and CDR/metadata are stored and processed, and require PDPA-compliant cross-border clauses if any of it leaves Singapore.

Verify for CommScope

  • Confirm key details directly with the vendor — this listing isn't vendor-managed yet.
  • Ask for two recent Singapore client references you can speak with.
  • Ask for a written scope of services before comparing quotes.
  • Request evidence of relevant certifications and their current validity.

Questions to ask

  • What committed uptime, latency, jitter, packet loss, and MTTR are in the SLA, and what credits apply when you miss them?
  • Are the primary and backup routes physically diverse, and which underlying FBO carries each path?
  • What are the full early-termination charges, notice period, and number-porting process if we leave?
  • What is the realistic installation lead time after a site survey, and can you guarantee dual-running during cutover?

Prepared under the TechDirectory editorial byline with review credit June C; this label is not proof of identity, credentials, or a completed human review. This directory-authored checklist is not attributed to CommScope; editorial independence has not been independently audited. Editorial standards

23/100

Profile signal score

Based on recorded profile signals. It is not a certification or independent verification of every claim, and it does not measure vendor quality or endorsement; paid plans do not affect it. How it works.

  • UEN recorded on profile UEN recorded 20/20
  • Owner-claimed profile No owner claim recorded 0/10
  • Recorded grant eligibility None recorded 0/15
  • Recorded CSA trustmark None / expired 0/15
  • Listed certifications None listed 0/10
  • Approved reviews No approved reviews yet 0/20
  • Profile completeness 3/10 completeness 3/10