Ascenix Data Centre

Operating an advanced Internet Data Centre just outside Singapore's Central Business District, Ascenix provides co-location and…

Request a quoteContactVisit website

Overview of Ascenix Data Centre

Operating an advanced Internet Data Centre just outside Singapore's Central Business District, Ascenix provides co-location and infrastructure services to enterprises and SMEs. The facility is carrier-neutral, giving customers full flexibility to choose from multiple ISPs and bandwidth providers based on their connectivity requirements. Built by specialists with a green, efficient design and managed by an experienced operations team, the data centre is accessible by public and private transport within minutes from the city centre. Ascenix continually reinvests in its infrastructure to deliver cost-effective solutions that help clients remain competitive.

  • Recorded Singapore presence: Physical Singapore office
  • Phone: +65 6392 2272
  • Website: https://ascenix.net/

Profile updated 1 Jul 2026 Report incorrect data

Buyer Decision Checklist

Singapore's data centre market runs under IMDA's Tropical Data Centre Standard and MTCS expectations, so the gap between a real colocation partner and a brochure shows up in the certificates, power terms, and on-ramps. Use this checklist before you sign a colocation or hosting contract.

How to evaluate a data centre / colocation provider in Singapore

  • Treat the Uptime Institute tier as a document, not a slogan: ask for the Tier-Certified Design Documents and Constructed Facility certificates (Tier III at 99.982% is the floor for serious workloads; Tier IV's ~30-50% premium is only worth it for trading floors or critical records).
  • If you serve government, finance, or healthcare, verify the provider's MTCS (SS 584) level on the IMDA register rather than accepting an 'MTCS-certified' logo — confirm it is Level 3 where sensitive or regulated data is involved.
  • Demand the underlying security and compliance audits behind the badges — ISO 27001, SOC 2 Type II, and PCI DSS where card data applies — and ask for the auditor name, scope, and audit date, not just the certificate cover.
  • Pin down power and resilience in writing: confirm whether redundancy is N+1 or 2N, get the last 12-month measured PUE and tested operating temperature (TR 95 / Tropical DC Standard alignment), and read the SLA clause on burst/overage power before modelling 36-month TCO.
  • Map connectivity to your stack: check for direct cloud on-ramps in the same facility (AWS Direct Connect, Azure ExpressRoute, GCP Partner Interconnect, OCI FastConnect), cross-connect density, and carrier choice so you are not locked to a single network.
  • Test the operational reality of physical security, PDPA obligations, and remote-hands and migration support — confirm 24/7 staffing, escort procedures, response SLAs, and who physically handles your kit at 3am.

Verify for Ascenix Data Centre

  • Confirm key details directly with the vendor — this listing isn't vendor-managed yet.
  • Ask for two recent Singapore client references you can speak with.
  • Ask for a written scope of services before comparing quotes.
  • Request evidence of relevant certifications and their current validity.

Questions to ask

  • What is your MTCS level on the IMDA register, and can you share the Uptime Institute tier certificate and the date of your most recent ISO 27001 / SOC 2 audit?
  • What was your measured PUE over the last 12 months, and is the power model metered, capped, or reserved — including the SLA terms on burst power?
  • Which cloud on-ramps and carriers are available cross-connect in this specific facility, and what are the cross-connect and migration fees?
  • What are your remote-hands response times and procedures, and how do you meet PDPA and physical-security obligations for tenant equipment and data?

Prepared under the TechDirectory editorial byline with review credit June C; this label is not proof of identity, credentials, or a completed human review. This directory-authored checklist is not attributed to Ascenix Data Centre; editorial independence has not been independently audited. Editorial standards

3/100

Profile signal score

Based on recorded profile signals. It is not a certification or independent verification of every claim, and it does not measure vendor quality or endorsement; paid plans do not affect it. How it works.

  • UEN recorded on profile No UEN recorded 0/20
  • Owner-claimed profile No owner claim recorded 0/10
  • Recorded grant eligibility None recorded 0/15
  • Recorded CSA trustmark None / expired 0/15
  • Listed certifications None listed 0/10
  • Approved reviews No approved reviews yet 0/20
  • Profile completeness 3/10 completeness 3/10